This morning, we made a couple of phone calls regarding the water pipe on the Navajo homesite. Last summer when we submitted the application, the worker mentioned it would take about 6 to 8 months for them to install. We haven’t heard anything from them. During our last visit on Navajoland last month, when we stopped by at their office, we dealt with the issue. The female worker said that they don’t have our application form, which means they had lost it, and that we would need to start over by submitting the same application form. Then a couple of hours later, we received a phone call from their office, but from the different male worker. He said they found our application form and they would process it. He promised us that he would call us again on the next Monday or Tuesday. He also asked us to call them back if we don’t hear from him. Then, the worker forgot to call us, and my husband forgot to call him back.
This morning when we call them back, the different female worker picked up the phone. She said that we would need to prepare all the equipment of bathroom such as a toilet ball, a shower, a sink, and an entire kitchen set for them to proceed the water piping work, which was totally different from what we heard. Since our application of the homesite, we were told to prepare a structure form them to lay a water pipe. We double-checked if it is okay to have a shed only, and the worker confirmed it is fine.
I hope we will be guided to the right person who can fix this issue right away and arrange the workers to lay water pipes for us.
